Changelog#

Next version#

🚀 New#

  • #2 HAL expose macro and actor command. Multiple subsequent commits fine-tuning its behaviour.

✨ Improved#

  • COS-68 Better handling of lamps during go to field macro. Reduce warm up time for HgCd lamp to 108 seconds to account for BOSS flushing.

  • COS-71 Update evening/morning calibration scripts with dithered version.

  • Improved FPI shutter handling.

  • Go to field:

    • Run fvc and boss_arcs stages concurrently.

    • Go to field: add a cherno stop during the prepare stage.

    • Do not reset cherno offset.

    • Re-slew and open FFS at the same time.

    • Slew timeout 160 -> 180s.

    • Run 5 iterations with full corrections in the acquire stage before moving to guiding using the PID coefficients.

🔧 Fixed#

  • If a stage has been finished, do not cancel it.

0.1.0 - January 7, 2022#

🚀 New#

  • Basic infrastructure for scripts and macros.

  • #1 Command to run scripts.

  • Goto commands and TCC status.

  • goto-field macro.